date
Time of day
Status
carried out
Files
Agenda items
- Ö1Openingof the meeting
- Ö2RemodellingofBlumenstraße Jügesheim Here: Design approval
- Ö3Motionby the ZmB Group: Complete equipment of municipal buildings with photovoltaic systems
- Ö4Mutualinformation
- Ö4.1Electricitygrid expansion- Federal Requirements Plan: Project No. 96 Aschaffenburg - Urberach
- Ö4.2Pumping of groundwaterby the ZWO from three wells of the Seligenstadt waterworks; here: local announcement and publication of the application documents
- Ö4.3Approval procedure in accordance with the Federal Immission Control Act (BImSchG); here: Interpretation of the documents for an emergency power supply system for a planned data centre in Dietzenbach
- Ö4.4Noise action planning- rail noise - Federal Railway Authority 2nd phase of public participation
- Ö4.5Rilkestraßearea unsealing, Here: Motion by the CDU, SPD, FWR and Bündnis '90 / Die Grünen parliamentary groups on printed matter 1655/2023
- Ö4.6Final reporton the degree of target achievement of the City of Rodgau's funding guideline for the dismantling of gravel gardens in the Rodgau urban area at the end of the 2023 funding period
- Ö4.7Mobility conceptfor Rodgau, Part 2. Here: Results of public participation and presentation "Mission statement and objectives".
- Ö4.8Communalheat planning, here letter from the Hessian State Minister for Economic Affairs, Energy, Transport and Housing, Tarek Al-Wazir, dated 30 October 2023